Washing and painting with complete waterproofing in Estérel

Washing, complete waterproofing and painting in Estérel

In Estérel, in the Laurentians, sheet metal roofs face a climate marked by heavy snow accumulations, intense freeze-thaw cycles and high ambient humidity. On this site, the URBI Roofing team carried out a complete high-pressure washing, a global waterproofing and then a new specialized paint to restore the roof to its full functionality.

Why treat waterproofing before painting

A roof with infiltration zones cannot be fixed with a simple coat of aesthetic paint. Until critical joints, flashings, and fasteners are reworked, moisture continues to penetrate under the coating and new paint peels off quickly. This logic of prior waterproofing is what distinguishes a sustainable construction site from a cosmetic fix.

High-pressure washing: the basis of adhesion

The high-pressure washing removed moss, lichens, encrusted dust and fragments of old paint that no longer held. This preparation conditions the adhesion of all the following. Our sheet metal roof painting service systematically includes this step as a mandatory prerequisite.

Complete waterproofing

Leak points and critical areas have been re-established to restore overall watertightness. On the most exposed surfaces, a bituminous coating was applied to permanently seal the risk areas. For more degraded roofs that have advanced corrosion or perforations, the intervention joins our sheet metal roof repair service.

Choice of the right siding for the Laurentian climate

In a region marked by large annual temperature variations, the coating must accompany the expansion of the metal without cracking. NOXYDE elastomeric paint is particularly suitable for these conditions, thanks to its flexibility and UV resistance. To compare the options available, our sheet dedicated to paint for tin roofs details the typical uses.

Two-pass application

Once the roof was sound, dry and waterproof, the paint was applied in two passes. The result is a homogeneous, waterproof roof that is protected against rust for many years.

Economic advantage of a well-executed complete construction site

The cost of a complete three-part project is higher than a simple painting, but it significantly extends the life of the roof. Over fifteen years, the cost gap is largely absorbed. Our file on the long-term protection of a sheet metal roof details this calculation.

Post-site maintenance

To preserve the result over time, a few simple annual gestures are enough. Our article on the maintenance of a sheet metal roof includes good practices: visual monitoring, cleaning of debris, control of fasteners.

Diagnosis and free quote

Each sheet metal roof refurbishment project begins with an on-site diagnosis and a free, no-obligation quote. This step allows you to set a precise budget, establish the intervention schedule according to the season and openly discuss the choices of coating adapted to the site. The majority of residential projects are completed between late spring and early fall, when weather conditions favour the drying of products. For large-area commercial buildings, the schedule is adjusted with the customer based on site-specific constraints.

URBI roofing in the Laurentians