In Plessisville, in the Centre-du-Québec region, the long winters and the annual temperature range put a lot of strain on metal roofs. On this project, the roof had both deteriorated coating and weak watertightness. The URBI Roofing team therefore combined three complementary interventions: stripping, complete waterproofing and painting.
A roof that takes on water cannot be fixed with a new aesthetic coating. As long as the joints, flashings and fasteners are not repaired, moisture continues to circulate under the paint and causes it to peel off within a few seasons. This structured approach is an integral part of our sheet metal roof repair service, which is combined with the painting phase for complete construction sites.
The high-pressure stripping removed all areas of old pavement that were coming off. This operation also highlights critical areas: advanced rust, micro-perforations, weakened joints. This is a key step in the sheet metal roofing painting service that we apply throughout Quebec.
The areas of weakness have been systematically taken over to restore an overall seal. On the most exposed roofs, the application of a bituminous coating makes it possible to permanently seal the critical areas before the application of the final paint. On this Plessisville site, it is this sequencing logic that ensures the longevity of the result.
Once the roof was sound, dry and waterproof, the paint was applied in two passes. The choice of product depends on several factors (condition of the metal, exposure, climate) and is always discussed with the customer. To understand the different families of products that can be used on a sheet metal roof, our sheet dedicated to paint for sheet metal roofs details the typical uses.
A three-part project costs more than just painting, but it extends the useful life of the roof by several years. Over time, the cost gap is quickly absorbed. Our file on the long-term protection of a sheet metal roof compares the possible options depending on the starting state.
To preserve the result, a few annual actions are enough: visual monitoring, cleaning of plant debris, checking flashings after episodes of strong wind. Our article on the maintenance of a sheet metal roof includes these best practices in detail.
Each sheet metal roof refurbishment project begins with an on-site diagnosis and a free, no-obligation quote. This step allows you to set a precise budget, establish the intervention schedule according to the season and openly discuss the choices of coating adapted to the site. The majority of residential projects are completed between late spring and early fall, when weather conditions favour the drying of products. For large-area commercial buildings, the schedule is adjusted with the customer based on site-specific constraints.
The team operates in Plessisville, Princeville, Victoriaville, Drummondville and throughout the region. Each project begins with an on-site inspection which allows us to establish a transparent and realistic intervention plan, adjusted to the condition of the roof.