High Pressure Washing, Sealing and Painting of Sheet Metal Roofing, Île d’Orléans

Washing, sealing and painting a roof on Île d’Orléans

Île d’Orléans is a particularly demanding environment for metal roofs: sustained winds, river spray, marked temperature differences and high ambient humidity. On this site, the URBI Roofing team combined three essential interventions: high-pressure washing, sealing of weak points and specialized painting.

Initial inspection and identification of critical areas

Before any intervention, a detailed inspection identified the areas requiring specific treatment: weakened joints, flashings to be repaired, fasteners to be tightened, micro-perforations to be sealed. This preliminary diagnosis is essential to properly calibrate the site and avoid treating only the symptoms rather than the causes.

Complete high-pressure washing

The high-pressure washing removed moss, accumulated lichens, organic dust and areas of old coating that were coming off. This preparation is integrated into our sheet metal roof painting service on all sites, without exception. Without it, no finishing product lasts long.

Sealing of weak areas

The weak points identified during the inspection were systematically taken up to restore the overall waterproofing of the roof. On the most exposed surfaces, a bituminous coating was applied to permanently seal the risk areas. For more deteriorated roofs, this component joins our sheet metal roof repair service.

Choosing the right coating for the island environment

In a humid and windy environment such as that of Île d’Orléans, the coating must combine UV resistance, flexibility and long-lasting adhesion. NOXYDE elastomeric paint is particularly suitable for these conditions, thanks to its flexibility and resistance to metal expansion. To better understand the options available, our sheet dedicated to paint for tin roofs details the typical uses.

Paint application

Once the roof was sound, dry and waterproof, the paint was applied in two successive passes. The result is a homogeneous, waterproof roof that is protected against rust for many years.

Why a three-part project

On a roof that has both an unstable coating and leak points, treating only the aesthetic aspect leads to a quick failure. The three-part project addresses root causes rather than symptoms, significantly extending the useful life of the roof. Our dossier on the long-term protection of a tin roof compares these approaches.

Post-site maintenance

To preserve the result over time, a few annual actions are enough: visual monitoring after episodes of strong wind, cleaning of plant debris, checking flashings. Our article on the maintenance of a sheet metal roof includes these good practices.

The team and equipment deployed on site

Each site mobilizes a team of specialized roofers and the necessary complete equipment: industrial pressure washer, sprayers, scaffolding and safety harnesses, professional products. This logistics makes it possible to carry out the sites efficiently without interruption.

URBI roofing in the greater Quebec City area

The team travels regularly to Île d’Orléans, to all parishes (Sainte-Famille, Saint-Pierre, Saint-Laurent, Saint-Jean), as well as to Beauport, Sainte-Foy, Lévis and throughout the greater region. Each project begins with an on-site inspection that allows a transparent diagnosis to be made.

Back to achievements
logo Google MyBusiness
Laissez nous un avis
Gérer le consentement